Alpha Siding Company renovated this Shirley home with all new siding and stone. First, Plum Creek Ledgestone was installed behind the railings underneath the front porch windows. Afterwards, dutch lap siding was installed around the whole house in Tuscan Clay color. New soffits were installed in glacier white, along with all finishing trim. The new siding should keep this Shirley home protected from the elements for a long time.
Siding Shirley
All posts dedicated to pictures of vinyl siding projects completed by Alpha Vinyl Siding in Shirley, NY. Alpha Siding specializes in the installation of siding in Shirley.
Windows & Siding Shirley
Alpha is a window and siding company that routinely does work in Shirley. This home is an example of a siding project where Monterey Sand Shakes were installed on the front of the home. The windows were replaced with double hung windows and they were complemented with green shutters. All remaining trim, including fascia and soffits were glacier white.
Shirley Window & Siding Replacement Project
We replaced the windows and siding on this ranch home in Shirley. First we replaced all of the windows with vinyl replacement windows, including two bay windows in the front. Then we replaced the siding around the whole house with clapboard vinyl siding. The siding color used in the picture is Colonial Ivory. All accents were done in white as white is a popular color to accent the colonial ivory.
Siding and Window Replacement Shirley
This home underwent a trifecta of renovations, which included windows, siding, and roofing. We replaced the roof with biscayne blue architectural shingles, as well as supplied and replaced the gutters and leaders. Then we replaced all the windows with new double hung replacement vinyl windows and picture window set ups featuring double hung flankers.
The next step in the process was to match a siding color that complemented the roof, which the homeowner decided for the “Mystic Blue” color. We put shakes in the front and clapboard siding on the sides. The homeowner also wanted to transition from an all blew color theme, so they decided for cranberry red shutters. Overall installation process took about two weeks.